Another project in the middle of London’s East End. RJB were asked to provide an SFS infill to the façade of an existing structure. Once formed the external was finished with a Candi wall brick slip system. Internally, the project required SFS joists to the upper floors and drylining throughout.
Drylining; External Facades; SFS Infill/Oversail
£485,000