Situated just outside Basildon town centre, this project consisted of an existing concrete/steel structure over four levels. These were to be framed around the external in an SFS infill system, however it was found that due to the nature of the steel work, the system would need to be changed to an Oversail system. On the current existing roof, a loadbearing SFS system was to be fitted to add another three new levels.
Loadbearing SFS
£680,000